The new production facility for the Leeb Fruit Orchard consists of a large main shed with cold storage and a fruit shop with adjoining spaces. The prefabricated structure was built within four months and the fruit shop with adjoining spaces were constructed in “passive house” standard and as self-supporting prefabricated wall and roof elements.
Photo © Courtesy of Architects Collective |
Photo © Courtesy of Architects Collective |
Photo © Courtesy of Architects Collective |
Photo © Courtesy of Architects Collective |
Photo © Courtesy of Architects Collective |
Photo © Courtesy of Architects Collective |
Photo © Courtesy of Architects Collective |
Photo © Courtesy of Architects Collective |
Photo © Courtesy of Architects Collective |
site plan--drawing Courtesy of Architects Collective |
groung floor plan--drawing Courtesy of Architects Collective |
roof plan--drawing Courtesy of Architects Collective |
section A-A,B-B--drawing Courtesy of Architects Collective |
section C-C--drawing Courtesy of Architects Collective |
diagram--drawing Courtesy of Architects Collective |
The people
Location:Wiener Strasse 40,
A-7161 St. Andrä am Zicksee, Austria
Client:
Vera & Albert Leeb
Wiener Straße 40
A-7161 St. Andrä am Zicksee
+43 680 21 64 304
Architect: Architects Collective
Planning services: architectural planning
schematic design/design development/construction documents/site supervision
Team:
Andreas Frauscher, Richard Klinger, Mathias Leeb, Kurt Sattler
Construction company:
Subau Baugesellschaft
Hauptstraße 110
A-7111 Parndorf
Carpentry:
Weissenseer Holz-System-Bau
Weißensee Straße 1
A-9761 Greifenburg
Steel construction:
SK Stahlbau
Hosnedlgasse 35
A-1220 Wien
Furniture:
Gabarge Upcycling Design
Schleifmühlgasse 6
1040 Wien
Site area: 3500 m²
Floor area: 400 m²
Gross floor area: 450 m²
Gross floor area: 2.500 m³
Planning: 2008
Construction: 2009
Building cost: €350.000
Construction cost: €400.000 (building costs, interior, landscape)
Capital cost: €450.000 (building costs, interior, exterior, fees, other costs)
Energy data
Energy standard: passive house
Heating demand: 16.10 kWh / m² a
Heating load: 12.60 W / m²
Building airtightness n50: 0.26 1 / h
Wall, roof, floor: 0.10 W / m² K
Wood-aluminum windows: 0.75 W / m² K
Glass triple pane, Ug = 0,60 W / m² K, g-value = 52%
Ventilation: micro compact ventilation with heat pump